 ====== Inspection Response ====== ====== Inspection Response ======
 +Both consumers and manufacturers are given 7 days to view the technical inspectors report and provide a response if so desired. Those responses will not be shared between parties until that time has passed. ​
 +  * Select **Technical Inspections** to review the document the inspector provided
 +{{::​technical_inspections_button.png|}}
 +  * Select **Inspection Response** to provide your response
 +{{::​inspection_response.png|}}
 +  * Insert any comments or add files that will support your case
 +  * Save once complete
 +{{::​ti_response.png|}}
 +==== Letter(s) ====
 +  * A [[Letters|manual letter]] should be sent to consumer, manufacturer that informs them that the inspector has issued a report and that they have seven (7) to respond to the report. ​ The inspector'​s report should be attached to the letter.
 +
 +==== Next Status ====
 +The claim will be moved into **Technical Inspection Review Complete** after the __**7**__ days have passed. The arbitrator will need to review the documents from the inspector, manufacturer and consumer. Informing the provincial administrator they have completed that.
 +
 +As a consumer and manufacturer you are able to view all parties responses once the 7 days have passed.  ​
 +
 +After the 7 days has passed the arbitrator will review the responses and issue their award.
  
  