====== Technical Inspection Requested ====== Now that a technical inspection has been requested, as a PA you will need to review the attached documents, assign a inspector to the claim and schedule a date and location for the inspection to be held. {{::pa_ti_requested.png|}} ===== Assigning a Technical Inspector ===== * Review the request documents * Select an available TI using the drop down menu * Contact information will be made available {{::ti_assign.png|}} ===== Schedule an Inspection ===== * Call the inspector to schedule a date, time and location for completing the inspection **NOTE:** Date and time will be based upon your time zone. However, in the event the hearing needs to occur in a different time zone. Select the appropriate time zone, from the pull down menu. * Provide location of inspection details in system {{::ti_schedule.png|}} **NOTE:** Until you add an address the technical inspection will __**NOT**__ move to the next status. * Select add address. Once you go to add an address you must add one, or you will lose all changes * Provide the address where the inspection will be held * Include any specific details about the location under directions ===== Cancel Request ===== You are also able to cancel the request by selecting cancel request. {{::ti_cancel_request.png|}} ==== Next Status ==== The claim will be moved into **Technical Inspection Scheduled**. As the provincial administrator you will coordinate collecting information from the technical inspector, as they do not have access to the system. ==== Letter(s) ==== * A [[Letters|manual letter]] should be sent to consumer, manufacturer and arbitrator that confirms that details of the technical inspection. ===== Upcoming Event ===== After the inspection is scheduled it will show up as an upcoming event on everyone's dashboard. The event will continue to stay in **Technical Inspection Requested** until all of the scheduled details have been provided. Then it will move to **Technical Inspection Scheduled**. {{::ti_event.png|}} When you select the event you will view a summary of who, when and where. As a PA by selecting the email address you will be able to contact the inspector using an external email solution. {{::ti_summary.png|}} ==== Next Status ==== At the end of business day in which the technical inspection was scheduled the claim will be moved to [[Technical Inspection Report Required]].