This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
technical_inspection_review_complete [2016/09/08 16:47] aweijers |
technical_inspection_review_complete [2019/01/05 22:10] (current) |
||
---|---|---|---|
Line 20: | Line 20: | ||
==== Letter(s) ==== | ==== Letter(s) ==== | ||
- | * A automated letter will be sent to the arbitrator reminding them that they must confirm that they have reviewed the technical inspection documents and forward their award. | + | * An automated letter will be sent to the arbitrator reminding them that they must confirm that they have reviewed the technical inspection documents and forward their award. |