User Tools

Site Tools


technical_inspection_review_complete

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
technical_inspection_review_complete [2016/07/27 17:13]
192.168.9.146
technical_inspection_review_complete [2019/01/05 22:10] (current)
Line 13: Line 13:
 ==== Next Status ==== ==== Next Status ====
 The claim returns to the status it was in prior to the technical inspection request. The claim returns to the status it was in prior to the technical inspection request.
-==== Letter(s) ==== + 
-**ARLENE TO UPDATE** +When the claim has had an eligibility/​arbitration/​award decision made prior to the inspectionbut as the arbitratoryou need to submit a new decisionInform the PA, they will push the status back to awaiting ​[[eligibility hearing scheduled|eligibility]], [[arbitration hearing scheduled|arbitration]][[award hearing scheduled|award]] decision. This will enable you to upload an additional decision or update the old decision. The PA will then remove the old decision from the system
-  * A automated letter will be sent to XXand X. +
-  * A [[Letters|manual letter]] should be sent to XXand X+
-**END UPDATE**+
 ====== Technical Inspection Review Overdue===== ====== Technical Inspection Review Overdue=====
 This is not so much as a decision, but that the arbitrator must view the report and comments if available from the consumer and manufacturer. Making the PA aware that they have this completed within __**10**__ days of **Technical Inspection Review Complete**. This is not so much as a decision, but that the arbitrator must view the report and comments if available from the consumer and manufacturer. Making the PA aware that they have this completed within __**10**__ days of **Technical Inspection Review Complete**.
 ==== Letter(s) ==== ==== Letter(s) ====
-**ARLENE TO UPDATE** + 
-  * automated letter will be sent to X, X, and X+  * An automated letter will be sent to the arbitrator reminding them that they must confirm that they have reviewed the technical inspection documents ​and forward their award
-  * A [[Letters|manual letter]] should be sent to X, X, and X. +
-**END UPDATE**+
  
  
technical_inspection_review_complete.1469639634.txt.gz · Last modified: 2019/01/05 22:10 (external edit)