This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
technical_inspection_review_complete [2016/07/26 18:40] 192.168.9.146 [Technical Inspection Review Complete] |
technical_inspection_review_complete [2019/01/05 22:10] (current) |
||
---|---|---|---|
Line 6: | Line 6: | ||
* Technical Inspection Review Complete | * Technical Inspection Review Complete | ||
{{::technical_inspection_review_complete.png|}} | {{::technical_inspection_review_complete.png|}} | ||
+ | |||
However, you are __**only**__ able to indicate the review is done by using the Technical Inspection Review Complete button. | However, you are __**only**__ able to indicate the review is done by using the Technical Inspection Review Complete button. | ||
You are able to access each of the documents provided by selecting the blue text. The report/document(s) will be downloaded for your review. | You are able to access each of the documents provided by selecting the blue text. The report/document(s) will be downloaded for your review. | ||
{{::technical_inspection_documents.png|}} | {{::technical_inspection_documents.png|}} | ||
+ | ==== Next Status ==== | ||
The claim returns to the status it was in prior to the technical inspection request. | The claim returns to the status it was in prior to the technical inspection request. | ||
+ | |||
+ | When the claim has had an eligibility/arbitration/award decision made prior to the inspection, but as the arbitrator, you need to submit a new decision. Inform the PA, they will push the status back to awaiting [[eligibility hearing scheduled|eligibility]], [[arbitration hearing scheduled|arbitration]], [[award hearing scheduled|award]] decision. This will enable you to upload an additional decision or update the old decision. The PA will then remove the old decision from the system. | ||
+ | |||
====== Technical Inspection Review Overdue===== | ====== Technical Inspection Review Overdue===== | ||
This is not so much as a decision, but that the arbitrator must view the report and comments if available from the consumer and manufacturer. Making the PA aware that they have this completed within __**10**__ days of **Technical Inspection Review Complete**. | This is not so much as a decision, but that the arbitrator must view the report and comments if available from the consumer and manufacturer. Making the PA aware that they have this completed within __**10**__ days of **Technical Inspection Review Complete**. | ||
+ | ==== Letter(s) ==== | ||
+ | |||
+ | * An automated letter will be sent to the arbitrator reminding them that they must confirm that they have reviewed the technical inspection documents and forward their award. | ||
+ | |||
+ | |||