User Tools

Site Tools


inspection_response

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
inspection_response [2016/07/27 16:33]
192.168.9.146
inspection_response [2019/01/05 22:10] (current)
Line 8: Line 8:
   * Save once complete   * Save once complete
 {{::​ti_response.png|}} {{::​ti_response.png|}}
 +==== Letter(s) ====
 +  * A [[Letters|manual letter]] should be sent to consumer, manufacturer that informs them that the inspector has issued a report and that they have seven (7) to respond to the report. ​ The inspector'​s report should be attached to the letter.
 +
 ==== Next Status ==== ==== Next Status ====
 The claim will be moved into **Technical Inspection Review Complete** after the __**7**__ days have passed. The arbitrator will need to review the documents from the inspector, manufacturer and consumer. Informing the provincial administrator they have completed that. The claim will be moved into **Technical Inspection Review Complete** after the __**7**__ days have passed. The arbitrator will need to review the documents from the inspector, manufacturer and consumer. Informing the provincial administrator they have completed that.
  
-As a consumer and manufacturer you are able to view all parties responses once the 7 days have passed. +As a consumer and manufacturer you are able to view all parties responses once the 7 days have passed. ​  
-==== Letter(s) ==== + 
-**ARLENE TO UPDATE** +After the 7 days has passed the arbitrator ​will review the responses ​and issue their award
-  * A automated letter ​will be sent to X, X, and X+ 
-  * A [[Letters|manual letter]] should be sent to X, X, and X. +
-**END UPDATE**+
inspection_response.1469637237.txt.gz · Last modified: 2019/01/05 22:10 (external edit)