This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
inspection_response [2016/07/13 14:23] 192.168.98.168 |
inspection_response [2019/01/05 22:10] (current) |
||
|---|---|---|---|
| Line 8: | Line 8: | ||
| * Save once complete | * Save once complete | ||
| {{::ti_response.png|}} | {{::ti_response.png|}} | ||
| - | ===== Technical Inspection Review Complete ===== | + | ==== Letter(s) ==== |
| - | The system will automatically make documentation viewable to all partied on the upcoming event of **Technical Inspection Review Complete**. As a consumer and manufacturer you are able to view that date on your dashboard. | + | * A [[Letters|manual letter]] should be sent to consumer, manufacturer that informs them that the inspector has issued a report and that they have seven (7) to respond to the report. The inspector's report should be attached to the letter. |
| + | |||
| + | ==== Next Status ==== | ||
| + | The claim will be moved into **Technical Inspection Review Complete** after the __**7**__ days have passed. The arbitrator will need to review the documents from the inspector, manufacturer and consumer. Informing the provincial administrator they have completed that. | ||
| + | |||
| + | As a consumer and manufacturer you are able to view all parties responses once the 7 days have passed. | ||
| + | |||
| + | After the 7 days has passed the arbitrator will review the responses and issue their award. | ||