This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
inspection_response [2016/07/13 14:16] 192.168.98.168 |
inspection_response [2019/01/05 22:10] (current) |
||
---|---|---|---|
Line 1: | Line 1: | ||
====== Inspection Response ====== | ====== Inspection Response ====== | ||
- | Both consumers and manufacturers are given 7 days to view the technical inspectors report and provide a response if so desired. Those responses will not be shared between parties until the 7 days have passed. | + | Both consumers and manufacturers are given 7 days to view the technical inspectors report and provide a response if so desired. Those responses will not be shared between parties until that time has passed. |
* Select **Technical Inspections** to review the document the inspector provided | * Select **Technical Inspections** to review the document the inspector provided | ||
{{::technical_inspections_button.png|}} | {{::technical_inspections_button.png|}} | ||
Line 8: | Line 8: | ||
* Save once complete | * Save once complete | ||
{{::ti_response.png|}} | {{::ti_response.png|}} | ||
+ | ==== Letter(s) ==== | ||
+ | * A [[Letters|manual letter]] should be sent to consumer, manufacturer that informs them that the inspector has issued a report and that they have seven (7) to respond to the report. The inspector's report should be attached to the letter. | ||
+ | |||
+ | ==== Next Status ==== | ||
+ | The claim will be moved into **Technical Inspection Review Complete** after the __**7**__ days have passed. The arbitrator will need to review the documents from the inspector, manufacturer and consumer. Informing the provincial administrator they have completed that. | ||
+ | |||
+ | As a consumer and manufacturer you are able to view all parties responses once the 7 days have passed. | ||
+ | |||
+ | After the 7 days has passed the arbitrator will review the responses and issue their award. | ||
+ | |||
+ |