 ====== Event ====== ====== Event ======
-===== Worksheet ===== +An event is an action that takes place. These do not have specific buttons or active actions required by the PA. 
-  * **Worksheet No OEM Response**: The OEM has not provided a response ​to the initial worksheet + 
-===== Claim Form ===== +An administrator can set up a number of [[letters|manual]] and [[maintenance letter templates|automated]] communications to a variety of [[maintenance users and roles|recipients]]. 
-  * **Claim Form Overdue**: The Consumer ​has not provided a completed ​claim form  +  * **Arbitrator Assigned**: A new arbitrator is assigned ​to the claim. 
-  * **Claim Form No OEM Response**: The OEM has not provided ​response ​to the consumers ​claim form +       * A [[Letters|manual letter]] should be sent to consumer, manufacturer,​ and the new arbitrator 
-===== Arbitrator ===== + 
-  * **Arbitration Decision Overdue**: The Arbitrator ​has facilitated a hearing ​and have not submitted their findings/​decision +  * **30 Day Claim Form Reminder**: The consumer ​has not filled in their claim form. They will be sent 30 day reminder ​to log in and fill out the claim form
-  * **Eligibility Decision Overdue**: The Arbitrator ​has conducted an eligibility conference and has not submitted their findings/​decision +       * An automated reminder letter will be sent to the consumer 
-  **Award Decision Overdue**: The Arbitrator has facilitated a hearing ​and have not submitted their findings/​decision + 
-===== Technical Inspection ===== +  * **Consumer Case Updated**: The consumer ​has made some changes. 
-  * **Technical Inspection Review Complete**: The Technical Inspector has provided their report and the PA has approved ​it +       * An automated letter will be sent to manufacturer,​ arbitrator ​and provincial administrator 
-  **Technical Inspection Decision Overdue**: The Technical Inspector has not submitted their decision ​to the Arbitrator yet + 
-  * **Technical Inspection Report Overdue**: The Technical Inspector ​has not submitted their report ​to the Arbitrator yet+  * **Consumer Relocation**: The consumer ​has relocated to another [[Area Served & Region|region]]. 
 +       ​A [[Letters|manual letter]] should be sent to the manufacturer,​ old arbitrator, new arbitrator ​and new provincial administrator ​ 
 + 
 +  * **Hearing Changed**: An integral piece of information about the hearing ​has changed. Whether ​it be the date, time or location. 
 +       ​A [[Letters|manual letter]] will be sent to consumer, manufacturer,​ and arbitrator 
 + 
 +  * **Manufacturer Case Updated**: The manufacturer ​has made some changes. 
 +       * An automated letter will be sent to consumer, arbitrator, and provincial administrator 
  
   ​   ​